POSITIVE COVENANT AND RESTRICTION 

AS TO USER LODGEMENT FORM

Made under Section 88E and/or section 88B of the Conveyancing Act 1919


For further information or questions regarding this form, please contact Council via 9911 6555.

Applicant details

Business Hours
Business Hours

Owners consent

Property details

DA & CC Details

Invoice with the application fee will be sent for payment.

Supporting information

Browse

Note:

  1. Ensure the Positive Covenant and Restriction on Use of Land terms are generally consistent with the standard terms in City of Canada Bay Council Development Control Plan – Appendix 2 – Engineering Specification, Section ES4. The terms can be found here.

  2. If you’re lodging an 88E Instrument, the Form 13RPA and 13PC obtained from the Land Registry Services New South Wales must uploaded together with terms in one file.

  3. If you’re lodging an 88B Instrument, the Deposit Plan and Deposited Plan Administration Sheet must be uploaded together with the terms in one file.

  4. The terms/wordings are to refer to the “Work-as-Executed” plan that would be uploaded together with this application.

Browse

Note: The works-as-executed (WAE) details must be prepared on a copy of an approved construction stormwater drainage plan, with the constructed levels shown in red, and must be signed by a registered surveyor. An example of an approved construction stormwater drainage plan may be the stormwater drainage plan that formed part of the Complying Development Certificate, Construction Certificate or Subdivision Works Certificate. For further details, please refer to the section Prior to Occupation (Final Certificate or Completion of Works) in the City of Canada Bay Council Development Control Plan – Appendix 2 – Engineering Specification.

Browse

Note: This is a certificate issued by a suitably qualified and experienced chartered engineer, certifying that the installed system complies with the relevant Australian Standards, Codes and Council’s stormwater development controls as outlined in City of Canada Bay Council – Development Control Plan – Appendix 2 – Engineering Specification.

Note: Council may reach out to you to arrange an audit of the constructed on site stormwater controlled system.

Declaration

I hereby state that the above information is true and correct.

Draw signature|Type signatureClear
reCAPTCHA